This page is a practical checklist, not legal advice. Local contract rules may require more formality.
What belongs on the form
- Reference to the original estimate or contract
- Clear description of the change
- Price add or deduct
- Schedule note if the change moves the date
- Contract sum ladder: original, prior changes, this change, revised total
- Signatures from both sides before work starts
Why the sum ladder matters
Without a running total, clients lose the thread and unpaid extras pile up. Keep one revised contract sum on every change order. Short version: contract sum checklist.
In the app, a change order recalculates the contract sum and needs its own client signature. Rule of thumb: sign before the extra work.